I've struggled too with this one.
I've now reached a conclusion that the 20k Areas of Responsibility are merely the Current Responsibilities, in the same way as 10k is my Current Projects that I'm working on. Both my 20k & 10k can either be aligned or not to my 40k & 30k perspectives.
For me, I'm beginning to realize that the reason I've struggled with where the 20k fits in is probably because not all of my Current Responsibilities align with my future perspectives (50-30k).
How I handle that, given the real-world constraints, is a different challenge.
I've now reached a conclusion that the 20k Areas of Responsibility are merely the Current Responsibilities, in the same way as 10k is my Current Projects that I'm working on. Both my 20k & 10k can either be aligned or not to my 40k & 30k perspectives.
For me, I'm beginning to realize that the reason I've struggled with where the 20k fits in is probably because not all of my Current Responsibilities align with my future perspectives (50-30k).
How I handle that, given the real-world constraints, is a different challenge.