For those of you using, or are familar, with Google or Yahoo Tasks, have you tried assigning more than one category to a task?
I know I can sync Outlook with Google, and I'm thinking I can also do the same with Yahoo. In Outlook, I have multiple categories assigned to some projects (e.g. call, !Next). If possible, I would like to perfectly sync these with either web site's online tasks.
Possible or not?
I know I can sync Outlook with Google, and I'm thinking I can also do the same with Yahoo. In Outlook, I have multiple categories assigned to some projects (e.g. call, !Next). If possible, I would like to perfectly sync these with either web site's online tasks.
Possible or not?