• Our deepest thanks to the many GTD enthusiasts who have posted in and read this forum over the years. Because use has been steadily declining in recent years, we have reluctantly decided to make this forum a read-only reference archive. There is an active GTD discussion community on the new GTD Connect. Copy/paste this link to get a free trial: https://bit.ly/4hYicYV We still offer a range of other free resources for GTD enthusiasts at: https://gettingthingsdone.com/resources/

Handling Start Date vs. Due Dates in Todoist

MichaelB215

Registered
I am considering moving from my beloved Things 3 to Todoist for the cross-platform functionality (I’m PC at work and Mac at home). One of the features I love in Things is the ability to assign tasks both a start date and due date/deadline. In Todoist, which doesn’t support this feature, a method I’ve tried is to have a Tickler “project” for those tasks with future start dates (I know these technically belong on my calendar, but I really prefer to keep them in my list manager). It works fine, but I am curious if anyone out there has another method that works well for them?
 
I am considering moving from my beloved Things 3 to Todoist for the cross-platform functionality (I’m PC at work and Mac at home). One of the features I love in Things is the ability to assign tasks both a start date and due date/deadline. In Todoist, which doesn’t support this feature, a method I’ve tried is to have a Tickler “project” for those tasks with future start dates (I know these technically belong on my calendar, but I really prefer to keep them in my list manager). It works fine, but I am curious if anyone out there has another method that works well for them?
That is actually exactly how I do this too: Todoist cannot handle start days, so I have a tickler list, and when tasks show up in the today view, and I see it comes from tickler, I assign it to a "real" context.

If the task is called "start working on xxx" I remove the due date.
If the task is called "xxx must be done today/by xx date", I keep/modify the date.

Yes, in theory it should be on the calendar, but I want all tasks to be in my task manager, and with Todoist/calendar integration, it will show up in my calendar anyway.
 
I had same issue moving from Omnifocus. I have created label @due and add it to tasks that are due along with the date. One without @due label it is start date. Working well for me.

Hope this helps.
 
Top