How to add a sub-task when you are in a label list in Todoist

Discussion in 'PUBLIC: Discuss Tools & Software for GTD' started by salilsurendran, Aug 5, 2018.

Tags:
  1. salilsurendran

    salilsurendran Registered

    Joined:
    Dec 4, 2015
    Messages:
    6
    Likes Received:
    1
    Trophy Points:
    3
    I use Todoist for GTD. It is not the best tool and I often go to my label list and see my list of tasks to do and then I plan as to what are the sub-tasks for this task. However, I can't a sub-task to the task in label list. I have to go to the project in which this task is and then add a sub-task. Anyway to do this?
     
  2. kelstarrising

    kelstarrising GTD Coach

    Joined:
    Nov 15, 2002
    Messages:
    3,739
    Likes Received:
    338
    Trophy Points:
    83
    Location:
    Ojai, CA
    I would set up Todoist the way the GTD & Todoist Setup Guide talks about instead:
    https://store.gettingthingsdone.com/Todoist-Setup-Guide-p/10484.htm
     

Share This Page